Where it fits
Builds the converter stations at each end of an HVDC link - valves, converter transformers, filters and controls - and the STATCOM and reactive-power devices that keep voltage steady as solar and wind swing. Only a handful of global groups own the technology; Indian partners do civil, transformers and parts of the build.
Why it matters
HVDC carries bulk power with lower losses over 1,000+ km, which is how Khavda's and Rajasthan's renewables reach Maharashtra. Two ±800 kV, 6 GW terminal pairs are now under order: Khavda-Nagpur (BHEL-Hitachi Energy, Nov 2024) and Barmer-II to South Kalamb (GE Vernova T&D, Sep 2026), plus AESL's Rajasthan link. These are among the largest single orders the equipment makers have ever booked.
Where the value pool sits
Large, lumpy orders (several thousand crore per terminal pair) with long execution (3-4 years). Margins are decent for the technology owner but projects carry execution and penalty risk. Converter transformers are the biggest equipment item.
Key drivers
Renewable zones in Rajasthan, Gujarat and Ladakh far from load centres
STATCOMs for grid stability with high renewable share
Cross-border links (Sri Lanka, Nepal, Bangladesh)
Potential bottlenecks
Only three or four HVDC technology suppliers worldwide, all booked by European offshore-wind and interconnector demand
Converter-transformer and valve capacity
Terrain: the Leh-Kaithal (Ladakh) HVDC tender drew a single bidder and POWERGRID is weighing an AC design (FY26)
Investor metrics to watch
HVDC orders booked and timing of revenue recognition